US Case Study · Virginia

Industrial Facility Rendering for ESI Total Fuel Management, Delivered in 7 Business Days

A large facility rendering for a trade show, delivered in 7 business days.

ClientESI Total Fuel Management, standby power fuel systems manufacturer
LocationVirginia
ServicesIndustrial 3D rendering
Timeline7 business days

The client

ESI Total Fuel Management designs and manufactures diesel fuel supply and filtration systems that keep standby power generators running in an emergency. The company was preparing to show a new process and new equipment at a trade show.

The challenge

ESI needed one large rendering that explained its whole facility, its fuel process and its new equipment at a glance. The deadline was 7 business days. With a trade show date that could not move, the team needed a studio it could trust to deliver on time.

What we created

  • A detailed aerial rendering of the full facility, from the main building to the fuel processing equipment
  • A row of containerized generator units shown open, so visitors can see the equipment inside
  • Fuel lines highlighted in red and a tanker truck making a delivery, so the fuel process reads clearly from across a trade show floor
  • Site details including fencing, piping, storage and access roads, with people for scale
7business days from start to trade show

The result

We delivered the full rendering inside the 7 business day deadline, ready for the trade show. ESI was very happy with the result and is now talking with EnDesign about augmented reality and virtual reality experiences for future trade shows.